Search Results

1st Huabei OCTG Machinery Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • East Ring Road 102#, Qingxian County, Hebei Province, People's Republic of China

  • Equipment:

  • Drill Pipe Body (NS.03.30.00.1110)
    - Heat Treatment, Inspection, NDT, Upsetting

EXPIRED

  • Valid from:

  • August 22, 2015

  • Valid to:

  • August 21, 2017

  • Registered since:

  • August 22, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

  • Fearnley Procter NS-1™ Level 4 – Hardbanding and Internal Plastic Coating are not applied at this facility therefore were not assessed.

Baoshan Iron & Steel Co., Ltd.; Tube, Pipe and Bar Business Unit

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No. 885 Fujin Road, Baoshan District, Shanghai, People's Republic of China

  • Equipment:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe Body (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Testing, Upsetting

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Inspection, Testing

EXPIRED

  • Valid from:

  • July 21, 2018

  • Valid to:

  • July 20, 2020

  • Registered since:

  • July 21, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Besmindo Australia Pty Ltd

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Unit 9, 20 Malcolm Road, Maddington, Perth WA 6109, Australia

  • Equipment:

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Inspection, Machining, Testing, Threading

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Inspection, Machining, Testing, Threading

  • Crossover Pup Joints (NS.03.30.80.1130)
    - Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • December 10, 2014

  • Valid to:

  • December 09, 2015

  • Registered since:

  • December 10, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 12 Livingstone St, Broome, WA 6725, Australia

  • Equipment:

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Inspection, Machining, Testing, Threading

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • February 26, 2015

  • Valid to:

  • February 25, 2016

  • Registered since:

  • February 26, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Bohai NKK Drill Pipe Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 102 Donghuan Road, Qing County, Cangzhou City, Hebei Province 062658, People's Republic of China

  • Equipment:

  • Drill Pipe with Welded Tool Joints (NS.03.30.00.1110 )
    - Assembly, Cold Rolling of Threads, Heat Treatment, Machining, Testing, Threading, Upsetting

  • Valid from:

  • November 24, 2022

  • Valid to:

  • November 23, 2024

  • Registered since:

  • November 24, 2010

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Bossong Engineering Pty. Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 189 Planet Street, Welshpool, Western Australia, 6725, Australia

  • Equipment:

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Cold Rolling of Threads, Inspection, Machining, Surface Treatment, Testing, Threading

  • Valid from:

  • August 10, 2022

  • Valid to:

  • August 09, 2024

  • Registered since:

  • August 10, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 26 McDaniel Road, Minyirr , Western Australia, 6725, Australia

  • Equipment:

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Cold Rolling of Threads, Inspection, Machining, Surface Treatment, Testing, Threading

  • Valid from:

  • August 10, 2022

  • Valid to:

  • August 09, 2024

  • Registered since:

  • August 10, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

CNPC Dagang Oilfield Testing Supervision and Evaluation Center

FACILITY APPROVAL

Inspection

  • Facility:

  • Dagang Oilfield , People's Republic of China

  • Equipment:

  • Drill Pipe and BHA Inspection ()
    - Dye Penetrant Inspection (DPI), Electromagnetic Inspection (EMI), Magnetic Particle Inspection (MPI), NDE Inspection Processes, Ultrasonic Testing (UT), Visual and Dimensional Inspection

  • Inspectors:  

  • Sun Peng 孙鹏

  • Song Aiguo 宋爱国

EXPIRED

  • Valid from:

  • February 14, 2022

  • Valid to:

  • February 13, 2023

  • Registered since:

  • February 14, 2022

  • Standards:

  • Fearnley Procter NS-2™Edition 3 Drill String Inspection Standard for Used Proprietary and Specialised Drilling and Well Completion Equipment

  • ISO 9001:2015

  • Exclusions:

  • Aluminium Drill Pipe Thermal Conductivity Test and Wired Drill Electric Inspection are excluded from the scope of this NS-2™ approval.

CNPC GWDC Drilling Tools Company

FACILITY APPROVAL

Inspection

  • Facility:

  • BOP Center of Sulige, Wushengi, E Er Duo Si, Inner Mongolia, People's Republic of China

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)
    - Dye Penetrant Inspection (DPI), Electromagnetic Inspection (EMI), Magnetic Particle Inspection (MPI), NDE Inspection Processes, Ultrasonic Testing (UT), Visual and Dimensional Inspection

  • Inspectors:  

  • Liu Shifeng 刘世峰

  • Zhao Guofeng 赵国锋

  • Li Zhen 李贞

  • Liu Liangliang 刘亮亮

  • Valid from:

  • April 21, 2022

  • Valid to:

  • April 20, 2024

  • Registered since:

  • April 21, 2021

  • Standards:

  • Fearnley Procter NS-2™Edition 3 Drill String Inspection Standard for Used Proprietary and Specialised Drilling and Well Completion Equipment

  • ISO 9001:2015

  • Exclusions:

  • Aluminium Drill Pipe Thermal Conductivity Test and Wired Drill Electric Inspection are excluded from the scope of this NS-2™ approval

China Oilfield Services Ltd. (COSL Drilling)

FACILITY APPROVAL

Inspection

  • Facility:

  • P.O. BOX 521 Tanggu , Tianjin 300452, People's Republic of China

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)
    - Dye Penetrant Inspection (DPI), Electromagnetic Inspection (EMI), Magnetic Particle Inspection (MPI), Ultrasonic Testing (UT), Visual and Dimensional Inspection

  • Inspectors:  

  • Li Tianying

  • Ding Shilei

  • Yang Wenliang

  • Geng Tao

  • Valid from:

  • March 28, 2022

  • Valid to:

  • March 27, 2024

  • Registered since:

  • March 28, 2019

  • Standards:

  • Fearnley Procter NS-2™Edition 3 Drill String Inspection Standard for Used Proprietary and Specialised Drilling and Well Completion Equipment

  • ISO 9001:2015

Command Drilling Products USA Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 18911 West Industrial Parkway, New Caney, Texas 77357, United States

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Working of Stress Relief Features, Inspection, Machining, Testing, Threading

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Cold Working of Stress Relief Features, Inspection, Machining, Testing, Threading

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • February 15, 2016

  • Valid to:

  • February 14, 2017

  • Registered since:

  • February 15, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 18911 West Industrial Parkway, New Caney, Texas 77357, United States

  • Equipment:

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Inspection, Machining, Testing, Threading

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Assembly, Inspection, Testing

  • Drill Pipe Tool Joints - Heavy Weight (NS.03.30.80.1110)
    - Assembly, Inspection, Testing

EXPIRED

  • Valid from:

  • February 15, 2016

  • Valid to:

  • February 14, 2017

  • Registered since:

  • February 15, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

DP-Master Manufacturing Co. Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Shen'gang Industry Zone, Jiangyin City, , Jiangsu Province, 214443, People's Republic of China

  • Equipment:

  • Drill Pipe Body (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Magnetic Particle Inspection (MPI), Ultrasonic Testing (UT), Upsetting

  • Drill Pipe with Welded Tool Joints (NS.03.30.00.1110 )
    - Assembly, Inspection, Testing

  • Valid from:

  • December 13, 2021

  • Valid to:

  • December 12, 2023

  • Registered since:

  • March 11, 2013

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Shen'gang Industry Zone, Jiangyin City, , Jiangsu Province, 214443, People's Republic of China

  • Equipment:

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Assembly, Inspection, Machining

  • Valid from:

  • January 31, 2022

  • Valid to:

  • January 30, 2024

  • Registered since:

  • January 31, 2019

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Shen'gang Industry Zone, Jiangyin City, , Jiangsu Province, 214443, People's Republic of China

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • April 10, 2020

  • Valid to:

  • April 09, 2022

  • Registered since:

  • January 21, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Shen'gang Industry Zone, Jiangyin City, , Jiangsu Province, 214443, People's Republic of China

  • Equipment:

  • Drill Pipe Body - Sour Service (NS.03.30.10.1110)
    - Heat Treatment, Inspection, Magnetic Particle Inspection (MPI), Ultrasonic Testing (UT), Upsetting

  • Drill Pipe - Sour Service (Critical Sour Drilling IRP Vol. 1 Section 1.8)
    - Assembly, Inspection, Testing

EXPIRED

  • Valid from:

  • December 13, 2017

  • Valid to:

  • December 12, 2019

  • Registered since:

  • September 17, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Golden Ring Industrial Limited-Liability Company Liaohe Oilfield Panjin

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Huanxi Street, Xinglongtai District,, Panjin, Liaoning, People's Republic of China

  • Equipment:

  • Pre-stressed Insulated Tubing (PJQR/QR-5.4-01.A/0 version 2018.3)
    - Inspection, NDT, Threading, Upsetting

Re-approval Assessment in Progress

  • Valid from:

  • April 14, 2019

  • Valid to:

  • April 13, 2020

  • Registered since:

  • April 14, 2019

  • Standards:

  • SY/T5324-2013

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

  • China Standard SY/T5324-2013: Section 6.1.1 & 6.1.2 Mechanical Property Testing and Section 7.1.2 Acceptance Inspection.

Guizhou Gaofeng Petroleum Machinery Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.22 Changling South Road, Guanshanhu District, Guiyang City, Guizhou Province, 550081, People's Republic of China

  • Equipment:

  • Fishing Jars & Accelerators (NS.07.30.00.1110)
    - Inspection, Machining, Surface Treatment, Testing, Threading

  • Drilling Jars & Accelerators (Hydraulic) (NS.06.42.11.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Drilling Jars & Accelerators - (Mechanical) (NS.06.42.17.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Stabilisers - Integral Blade (NS.03.38.82.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Stabilisers - Replacement Blade (NS.03.38.82.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Valid from:

  • March 12, 2023

  • Valid to:

  • March 11, 2025

  • Registered since:

  • March 12, 2014

  • Standards:

  • Fearnley Group NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Gaofeng Town, Gui'An New District, Guizhou Province, 550081, People's Republic of China

  • Equipment:

  • Kelly Valve Sub (NS.03.35.01.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Fishing Tools (NS.03.39.00.1110)
    - Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Roller Reamer - Straight, Low Alloy, Non-Sour (NS.03.44.60.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Valid from:

  • March 12, 2023

  • Valid to:

  • March 11, 2025

  • Registered since:

  • March 12, 2014

NS-1™ Level 5 Certificate No: 130/23-5

  • Standards:

  • Fearnley Group NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Hebei Huayouyiji Tuboscope Coating Co., Ltd. (HHTCC) – Jiangyin Facility

FACILITY APPROVAL

Service

  • Facility:

  • Hetun Road West, Shengang Town, Jiangyin City, Jiangsu Province 214443, People's Republic of China

  • Service:

  • Internal Plastic Coating Application

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Product(s):

  • TK 34, TK 34XT, DPC, TK 2, TK 7, TK 69, TK 15, TK 70, TK 70XT, TK 34P, TK 216, TK 236, TK 505, TK 800, TK 805

  • Valid from:

  • January 08, 2023

  • Valid to:

  • January 07, 2025

  • Registered since:

  • January 08, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • ISO 9001:2015

  • Exclusions:

  • ISO 9001:2015: Section 8.3 Design and Development of Products and Services.

Hebei Huayouyiji Tuboscope Coating Co., Ltd. (HHTCC) – Qing Xian Facility

FACILITY APPROVAL

Service

  • Facility:

  • No.102 Dong Huan Road Qing County Hebei Province, 062658, People's Republic of China

  • Service:

  • Internal Plastic Coating Application

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Product(s):

  • TK 34, TK 34XT, DPC, TK 2, TK 7, TK 69, TK 15, TK 70, TK 70XT, TK 34P, TK 216, TK 236, TK 505, TK 800, TK 805

  • Valid from:

  • January 08, 2023

  • Valid to:

  • January 07, 2025

  • Registered since:

  • January 08, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • ISO 9001:2015

  • Exclusions:

  • ISO 9001:2015: Section 8.3 Design and Development of Products and Services.

Hebei Longway Petroleum Equipment Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Beikou Village, Yingli Town , Jinzhou, Shijiazhuang City, Hebei, People's Republic of China

  • Equipment:

  • Drill Pipe Body (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Testing, Upsetting

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Cold Rolling of Threads, Forging, Heat Treatment, Inspection, Machining, Testing

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly

  • Valid from:

  • September 01, 2022

  • Valid to:

  • August 31, 2024

  • Registered since:

  • September 01, 2017

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Henan Shenlong Petroleum Drilling Tools Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Yugong South Road, Tech Zone, Jiyuan City, Henan Province, People's Republic of China

  • Equipment:

  • Drill Collars - Non Magnetic, High Alloy, Non-Sour (NS.03.65.00.3110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Testing, Threading

  • Pup Joints - Non Magnetic, High Alloy, Non-Sour (03.65.00.3110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Testing, Threading

  • Substitutes - Non Magnetic, High Alloy, Non-Sour (03.65.00.3110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Testing, Threading

Re-approval Assessment in Progress

  • Valid from:

  • July 25, 2021

  • Valid to:

  • July 24, 2023

  • Registered since:

  • July 25, 2016

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Henan Zhongyuan Special Steel Equipment Manufacturing Co., Ltd

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Jiyuan City Henan Province, 459008, People's Republic of China

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling, Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Kellies - Non Welded (NS.03.36.12.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Stabilisers - Integral Blade (NS.03.38.82.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Stabilisers - Replacement Blade (NS.03.38.82.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Collars - Non Magnetic, High Alloy, Non-Sour (NS.03.65.00.3110)
    - Cold Rolling of Threads & Stress Relief Features, Forging, Inspection, Machining, Testing, Threading

  • Valid from:

  • June 20, 2022

  • Valid to:

  • June 19, 2024

  • Registered since:

  • June 20, 2013

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Hilong Drill Pipe (Wuxi) Co., Ltd

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No. 217, Xitai Road, Meicun Town, Wuxi New District , People's Republic of China

  • Equipment:

  • Drill Pipe with Welded Tool Joints (NS.03.30.00.1110 )
    - Manufacture of Tool Joints: Forging, Heat Treatment, Machining, Threading, Cold Rolling of Threads, NDT & Inspection

  • Valid from:

  • October 06, 2022

  • Valid to:

  • October 05, 2023

  • Registered since:

  • October 05, 2022

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Hilong Petroleum Pipe Company LLC

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Industrial City, Abu Dhabi, United Arab Emirates

  • Equipment:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Hardbanding, Internal Plastic Coating

EXPIRED

  • Valid from:

  • January 12, 2015

  • Valid to:

  • January 12, 2017

  • Registered since:

  • January 12, 2011

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Hunting Energy Services Limited

FACILITY APPROVAL

Rental

  • Facility:

  • Unit 1, Hareness Circle, Altens Industrial Estate, AB12 3LY, United Kingdom

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)

  • Drill Collars - Non Magnetic, High Alloy, Non-Sour (NS.03.65.00.3110)

  • Stabilisers - Integral Blade (NS.03.38.82.1110)

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)

  • Stabilisers - Welded Blade (NS.03.38.78.1110)

  • Hole Openers (NS.03.44.58.1110)

  • Stabilisers - Non Magnetic (NS.03.65.00.3110)

SUSPENDED

  • Valid from:

  • November 01, 2015

  • Valid to:

  • October 31, 2017

  • Registered since:

  • November 01, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

ICO Asiapacific Brunei Sdn Bhd

FACILITY APPROVAL

Inspection

  • Facility:

  • No. 143, Simpang, 141-145, Jalan Sungai Pandan, Kuala Belait KA 1931, Negara, Brunei Darussalam

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)
    - Electromagnetic Inspection (EMI), Magnetic Particle Inspection (MPI), Ultrasonic Testing of End Area (UTEA), Visual and Dimensional Inspection

  • Inspectors:  

  • Fredrick Periman

  • Yusriono Saragih

EXPIRED

  • Valid from:

  • March 15, 2019

  • Valid to:

  • March 14, 2020

  • Registered since:

  • March 15, 2019

  • Standards:

  • Fearnley Procter NS-2™Edition 3 Drill String Inspection Standard for Used Proprietary and Specialised Drilling and Well Completion Equipment

Jiangsu Elite Petroleum Technology Co., Ltd

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No. 21 East Xinyan Road, Shizhuang, HuangTu Town, Jiangyin City, Jiangsu 214446, People's Republic of China

  • Equipment:

  • Drill Pipe with Welded Tool Joints (NS.03.30.00.1110 )
    - Manufacture of Tools Joints Only: Heat Treatment, Machining, Threading, Cold Rolling of Threads, NDT & Inspection

EXPIRED

  • Valid from:

  • November 01, 2020

  • Valid to:

  • October 31, 2021

  • Registered since:

  • November 01, 2020

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • The application of hardband was not assessed at the time of audit and is therefore excluded from this NS-1™approval.

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Jiangsu Hexin Petroleum Machinery CO., LTD

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.9, Weiwu Road, Dongtai Industrial Park, Dongtai City, Jiangsu Province, 224200 , People's Republic of China

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe with Welded Tool Joints (NS.03.30.00.1110 )
    - Assembly, Cold Rolling of Threads, Heat Treatment, Inspection, Machining, Testing

  • Valid from:

  • October 10, 2022

  • Valid to:

  • October 09, 2024

  • Registered since:

  • October 10, 2021

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.9, Weiwu Road, Dongtai Industrial Park, Dongtai City, Jiangsu Province, 224200 , People's Republic of China

  • Equipment:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Cold Rolling of Threads, Forging, Heat Treatment, Inspection, Machining, Testing

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Inspection, Testing

EXPIRED

  • Valid from:

  • January 31, 2018

  • Valid to:

  • January 30, 2019

  • Registered since:

  • January 31, 2018

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Jiangsu Shuguang Energy Equipment & Tools Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Shuguang Avenue # 18, , Baimi Town, Jiangyan District, Taizhou City, Jiangsu Province, 225532 , People's Republic of China

  • Equipment:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Cold Rolling of Threads, Heat Treatment, Inspection, Machining, NDT, Threading

  • Drill Pipe Tool Joints - Heavy Weight (NS.03.30.80.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, NDT, Threading

  • Valid from:

  • June 11, 2021

  • Valid to:

  • June 10, 2023

  • Registered since:

  • June 11, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

  • Fearnley Procter NS-1™ Level 4 – Hardbanding and Internal Plastic Coating are not applied at this facility therefore were not assessed.

Jiangsu Shuguang Huayang Drilling Tool Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Shuguang Avenue # 18, Baimi Town, Jiangyan District, , Taizhou City, Jiangsu Province, 225532, People's Republic of China

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Heat Treatment, Inspection, Testing, Upsetting

  • Drill Pipe Body - Heavyweight (NS.03.30.80.1110)
    - Heat Treatment, Inspection, Machining, Testing

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Assembly

  • Valid from:

  • March 31, 2023

  • Valid to:

  • March 30, 2025

  • Registered since:

  • February 10, 2011

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Jiangsu TSC Coating Co., Ltd.

FACILITY APPROVAL

Service

  • Facility:

  • Shuguang Industrial Park, Shuguang Road, Baimi Town, Jiangyan City, Jiangsu Province, People's Republic of China

  • Service:

  • Internal Plastic Coating Application

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Product(s):

  • TC 2000

EXPIRED

  • Valid from:

  • February 10, 2015

  • Valid to:

  • February 09, 2017

  • Registered since:

  • November 14, 2006

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Jiangyin Beilong Petroleum Pipe Co., Ltd

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.18, Xianzhuang Road, Huangtu Town,, Jiangyin, Jiangsu , 214445, People's Republic of China

  • Equipment:

  • Drill Pipe with Welded Tool Joints (NS.03.30.00.1110 )
    - Cold Rolling of Threads, Heat Treatment, Inspection, Machining, Manufacture of Tool Joints Only, NDT, Threading

EXPIRED

  • Valid from:

  • January 27, 2020

  • Valid to:

  • January 26, 2021

  • Registered since:

  • January 27, 2020

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Jiangyin DJ Coating Co., Ltd.

FACILITY APPROVAL

Service

  • Facility:

  • No.797, West Binjiang Road, New Harbor City , Economy Development Zone , People's Republic of China

  • Service:

  • Internal Plastic Coating Application

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Product(s):

  • Powder Coating Product DJ 207SS , Powder Coating Product DJ 106

  • Valid from:

  • June 25, 2021

  • Valid to:

  • June 24, 2023

  • Registered since:

  • November 28, 2019

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Exclusions:

  • ISO 9001:2015. Sect 8.3 Design and Development of Products and Services.

Jiangyin Hengyang Petroleum Machinery Co. Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.888, Yangzi River Road, Huangtu Town, Jiangyin City, Jiangsu, People's Republic of China

  • Equipment:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Cold Rolling, Forging, Heat Treatment, Inspection, Machining, Threading

EXPIRED

  • Valid from:

  • September 30, 2015

  • Valid to:

  • September 29, 2017

  • Registered since:

  • September 30, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

  • Fearnley Procter NS-1™ Level 4 – Hardbanding and Internal Plastic Coating are not applied at this facility and therefore were not assessed.

Jiangyin Long-Bright Drill Pipe Manufacture Co. Ltd

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.820, Binjiang West Road, Ligang Town, Jiangyin City, Jiangsu Province, People's Republic of China

  • Equipment:

  • Drill Pipe Body (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Testing, Upsetting

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Hardbanding

EXPIRED

  • Valid from:

  • January 26, 2015

  • Valid to:

  • January 25, 2017

  • Registered since:

  • January 26, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Jiangyin Yashen Petroleum Pipe Co. Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No 95, Xili Road,, Ligang Town, Jiangyin, Jiangsu, People's Republic of China

  • Equipment:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Forging, Heat Treatment, Inspection, Testing, Threading

EXPIRED

  • Valid from:

  • February 08, 2015

  • Valid to:

  • February 07, 2016

  • Registered since:

  • February 08, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

  • Fearnley Procter NS-1™ Level 4 – Hardbanding and Internal Plastic Coating are not applied at this facility and therefore were not assessed.

Knight Oil Tools Tri*Drill Services

FACILITY APPROVAL

Service

  • Facility:

  • 1001, Briar Patch Road,, Broussard,, Louisiana 70518, United States

  • Service:

  • Hardbanding Application

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Product(s):

  • Tritanium, Duraband® NC, Tuffband NC, Stoody HB 56

EXPIRED

  • Valid from:

  • May 01, 2014

  • Valid to:

  • April 30, 2016

  • Registered since:

  • May 01, 2011

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

NOV (Jiangsu) Energy Equipment Limited (former Grant Prideco (Jiangsu) Drilling Products Company Ltd.)

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 18 Zhanghang Road, Jiangyan City, Jiangsu Province, People's Republic of China

  • Equipment:

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Cold Rolling of Threads, Inspection, Machining, Surface Treatment, Testing, Threading

  • Valid from:

  • January 08, 2023

  • Valid to:

  • January 07, 2025

  • Registered since:

  • January 08, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 18 Zhanghang Road, Jiangyan City, Jiangsu Province, People's Republic of China

  • Equipment:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Inspection, Testing

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Testing, Threading

  • Valid from:

  • January 08, 2023

  • Valid to:

  • January 07, 2025

  • Registered since:

  • January 08, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Nantong Yongda Pipe Industry Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No 111, Kaiyuan Road, Hai’an Industry Park, Hai’an Country, Jiangsu Province, People's Republic of China

  • Equipment:

  • Drill Pipe Body (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Machining, Testing, Upsetting

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Inspection, Testing

  • Drill Pipe Body - Heavyweight (NS.03.30.80.1110)
    - Heat Treatment, Machining, Testing

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Assembly, Inspection, Testing

  • Valid from:

  • April 24, 2022

  • Valid to:

  • April 23, 2024

  • Registered since:

  • April 24, 2017

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

OTTO FUCHS KG

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Derschlager Strabe 26, 58540 Meinerzhagen , Germany

  • Equipment:

  • Drill Pipe - Aluminium with Shrink Fit Tool Joints, HIgh Alloy (NS.03.30.80.7110)
    - Assembly, Extrusion, Heat Treatment, Inspection, Solution Heat Treatment, Testing

EXPIRED

  • Valid from:

  • September 11, 2018

  • Valid to:

  • September 10, 2020

  • Registered since:

  • September 11, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.7.1.2 Servicing

PLCO Manufacture Co. Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.1201, Zhencheng Road, Shen-gang Town, Jiangyin City,, Jiangsu Province, 214443, People's Republic of China

  • Equipment:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Forging, Heat Treatment, Inspection, Testing, Threading

EXPIRED

  • Valid from:

  • September 30, 2014

  • Valid to:

  • September 29, 2016

  • Registered since:

  • September 30, 2011

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Paradigm Drilling Services

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Caimiestone Road, , Thainstone, Inverurie,, Scotland, United Kingdom

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Drill Collars - Non Magnetic, High Alloy, Non-Sour (NS.03.65.00.3110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Stabilisers - Integral Blade (NS.03.38.82.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Stabilisers - Replacement Blade (NS.03.38.82.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Stabilisers - Welded Blade (NS.03.38.78.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • December 17, 2015

  • Valid to:

  • December 16, 2016

  • Registered since:

  • December 17, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Rental

  • Facility:

  • Caimiestone Road, , Thainstone, Inverurie,, Scotland, United Kingdom

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)

  • Drill Collars - Non Magnetic, High Alloy, Non-Sour (NS.03.65.00.3110)

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)

  • Stabilisers - Integral Blade (NS.03.38.82.1110)

  • Stabilisers - Replacement Blade (NS.03.38.82.1110)

  • Stabilisers - Welded Blade (NS.03.38.78.1110)

EXPIRED

  • Valid from:

  • December 17, 2015

  • Valid to:

  • December 16, 2016

  • Registered since:

  • December 17, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Petromaterials (Cangzhou) Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Gongmaoxiaoqu, Qingzhouzhen, Qing County, Hebei, People's Republic of China

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Drill Pipe with Welded Tool Joints (NS.03.30.00.1110 )
    - Assembly, Cold Rolling of Threads, Forging, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Upsetting

  • Valid from:

  • May 14, 2022

  • Valid to:

  • May 13, 2024

  • Registered since:

  • May 14, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Gongmaoxiaoqu, Qingzhouzhen, Qing County, Hebei, People's Republic of China

  • Equipment:

  • Drill Pipe Tool Joints - Heavy Weight (NS.03.30.80.1110)
    - Cold Rolling of Threads & Stress Relief Features, Forging, Heat Treatment, Inspection, Machining, Surface Treatment, Testing

  • Drill Pipe Body - Heavyweight (NS.03.30.80.1110)
    - Heat Treatment, Inspection, Machining, Testing

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Assembly, Inspection, Testing

EXPIRED

  • Valid from:

  • May 14, 2020

  • Valid to:

  • May 13, 2022

  • Registered since:

  • May 14, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Gongmaoxiaoqu, Qingzhouzhen, Qing County, Hebei, People's Republic of China

  • Equipment:

  • Drill Pipe with Welded Tool Joints (NS.03.30.00.1110 )
    - Cold Rolling of Threads, Forging, Heat Treatment, Inspection, Machining, Surface Treatment, Testing

  • Drill Pipe with Welded Tool Joints (NS.03.30.00.1110 )
    - Assembly, Inspection, Testing

EXPIRED

  • Valid from:

  • May 14, 2020

  • Valid to:

  • May 13, 2022

  • Registered since:

  • May 13, 2020

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Pipe & Drilling Tools Manufacture Co. Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Petro & High-Tech Industrial Park Economic Development Zone, Panjin City, Liaoning 124013, People's Republic of China

  • Equipment:

  • Drill Pipe with Welded Tool Joints (NS.03.30.00.1110 )
    - Assembly, Inspection

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • August 22, 2019

  • Valid to:

  • August 21, 2021

  • Registered since:

  • August 22, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Rotary Drilling Tools USA LLC

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 9022 Vincik Ehlert, Beasley , TX 77414, United States

  • Equipment:

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Processes being assessed

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Processes being assessed

EXPIRED

  • Valid from:

  • April 28, 2015

  • Valid to:

  • April 27, 2016

  • Registered since:

  • April 28, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 9022 Vincik Ehlert, Beasley , TX 77414, United States

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Inspection, Machining, Testing, Threading

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Inspection, Machining, Testing, Threading

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • April 28, 2015

  • Valid to:

  • April 27, 2016

  • Registered since:

  • April 28, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Shandong Weima Equipment Science & Technology Corporation Limited

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No. 5 Fuqian Street, Economic Development Zone , Dongying City, Shandong Province, People's Republic of China

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe with Welded Tool Joints (NS.03.30.00.1110 )
    - Assembly, Cold Rolling of Threads, Forging, Heat Treatment, Inspection, Machining, Testing, Upsetting

  • Valid from:

  • February 28, 2023

  • Valid to:

  • February 27, 2025

  • Registered since:

  • June 23, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No. 5 Fuqian Street, Economic Development Zone , Dongying City, Shandong Province, People's Republic of China

  • Equipment:

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Assembly, Cold Rolling of Threads & Stress Relief Features, Hardbanding, Heat Treatment, Inspection, Machining, Testing, Threading

  • Valid from:

  • February 28, 2023

  • Valid to:

  • February 27, 2025

  • Registered since:

  • June 23, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Shanghai Hilong Drill Pipe Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.1825 Luodong Road, Baoshan Industrial Zone, Shanghai, 200949, People's Republic of China

  • Equipment:

  • Drill Pipe with Welded Tool Joints (NS.03.30.00.1110 )
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe Body (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Testing, Upsetting

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Inspection, Testing

  • Valid from:

  • January 15, 2022

  • Valid to:

  • January 14, 2024

  • Registered since:

  • January 15, 2009

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.1825 Luodong Road, Baoshan Industrial Zone, Shanghai, 200949, People's Republic of China

  • Equipment:

  • Drill Pipe Tool Joints - Heavy Weight (NS.03.30.80.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe Body - Heavyweight (NS.03.30.80.1110)
    - Heat Treatment, Inspection, Testing

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Assembly, Inspection, Testing

  • Valid from:

  • January 15, 2022

  • Valid to:

  • January 14, 2024

  • Registered since:

  • June 01, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Shanghai Tianhe Oil Engineering Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No. 2999 Xinyang Road Fengxian District, Shanghai, 201413, People's Republic of China

  • Equipment:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Inspection, Testing

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Heat Treatment, Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • October 12, 2015

  • Valid to:

  • October 11, 2016

  • Registered since:

  • October 12, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No. 2999 Xinyang Road Fengxian District, Shanghai, 201413, People's Republic of China

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Kellies - Non Welded (NS.03.36.12.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Stabilisers - Integral Blade (NS.03.38.82.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • October 12, 2015

  • Valid to:

  • October 11, 2016

  • Registered since:

  • October 12, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No. 2999 Xinyang Road Fengxian District, Shanghai, 201413, People's Republic of China

  • Equipment:

  • Drill Collars - Non Magnetic, High Alloy, Non-Sour (NS.03.65.00.3110)
    - Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • October 12, 2015

  • Valid to:

  • October 11, 2016

  • Registered since:

  • October 12, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Shanghai Tube-Cote Petroleum Pipe Coating Co., Ltd.

FACILITY APPROVAL

Service

  • Facility:

  • 669 Jinle Road, Yuepu Industry Park, Baoshan District,Shanghai, 200941, People's Republic of China

  • Service:

  • Internal Plastic Coating Application

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Product(s):

  • TC 2000P

  • Valid from:

  • August 28, 2022

  • Valid to:

  • August 27, 2024

  • Registered since:

  • September 15, 2019

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • ISO 9001:2015: Section 8.3 Design and Development of Products and Services.

FACILITY APPROVAL

Service

  • Facility:

  • 669 Jinle Road, Yuepu Industry Park, Baoshan District,Shanghai, 200941, People's Republic of China

  • Service:

  • Internal Plastic Coating Application

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Product(s):

  • TC 2000

EXPIRED

  • Valid from:

  • March 30, 2017

  • Valid to:

  • March 29, 2019

  • Registered since:

  • November 14, 2006

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Shanxi Fenglei Drilling Tools Co., Ltd. (Shanxi North Fenglei Industrial Group Co., Ltd.)

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.188 Fenglei Street,, Houma City,, Shanxi Province,, People's Republic of China

  • Equipment:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Cold Rolling of Threads, Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe Body (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Testing, Upsetting

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Inspection, Testing

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

Re-approval Assessment in Progress

  • Valid from:

  • March 29, 2021

  • Valid to:

  • March 28, 2023

  • Registered since:

  • March 29, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.188 Fenglei Street,, Houma City,, Shanxi Province,, People's Republic of China

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

Re-approval Assessment in Progress

  • Valid from:

  • March 29, 2021

  • Valid to:

  • March 28, 2023

  • Registered since:

  • April 10, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No.188 Fenglei Street,, Houma City,, Shanxi Province,, People's Republic of China

  • Equipment:

  • Drill Pipe Tool Joints - Heavy Weight (NS.03.30.80.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe Body - Heavyweight (NS.03.30.80.1110)
    - Inspection, Machining, Testing

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Assembly, Inspection, Testing

Re-approval Assessment in Progress

  • Valid from:

  • March 29, 2021

  • Valid to:

  • March 28, 2023

  • Registered since:

  • March 29, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Shengli Oilfield Wuhua Tube-Cote Oil Pipeline Coating Co., Ltd. (Part of Shengli Oilfield Wuhua Industry Development Co., Ltd. Group)

FACILITY APPROVAL

Service

  • Facility:

  • No.120, Xier Road, Dongying City,, Shandong Province , People's Republic of China

  • Service:

  • Internal Plastic Coating Application

  • Equipment:

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)

  • Product(s):

  • TC 2000, TC 2000P

  • Valid from:

  • December 08, 2021

  • Valid to:

  • December 07, 2023

  • Registered since:

  • December 08, 2020

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • ISO 9001:2015

  • Exclusions:

  • ISO 9001:2015. Section 8.3 Design and Development of Products and Services.

Sub-drill Supply Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Endeavour Drive, Arnhall Business Park, Westhill, Aberdeenshire , AB32 6UF, Scotland, United Kingdom

  • Equipment:

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Top Drive Saver Subs (NS.03.60.00.1120)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

EXPIRED

  • Valid from:

  • May 02, 2019

  • Valid to:

  • May 01, 2021

  • Registered since:

  • May 02, 2016

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Subsidiary Enterprise - Drill Collars and Kellys Plant

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 2, Komarova Street Sumy, 40020, Ukraine

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Working of Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Kellies - Non Welded (NS.03.36.12.1110)
    - Cold Working of Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Cold Working of Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling of Threads & Stress Relief Features, Heat Treatment, Inspection, Machining, Testing, Threading

  • Valid from:

  • October 20, 2021

  • Valid to:

  • October 19, 2023

  • Registered since:

  • October 20, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Surbo Tubular Services, Inc

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 8861 Park Ave, Houma, Louisiana 70363, United States

  • Equipment:

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Surface Treatment, Testing, Threading

  • Top Drive Saver Subs (NS.03.60.00.1120)
    - Cold Rolling of Threads & Stress Relief Features, Inspection, Machining, Testing, Threading

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Cold Rolling of Threads, Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • February 14, 2020

  • Valid to:

  • September 12, 2020

  • Registered since:

  • February 14, 2017

  • Standards:

  • Fearnley Procter NS-2™Edition 3 Drill String Inspection Standard for Used Proprietary and Specialised Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

TSP Co., Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No 34-74 Sanggae-ro, Nam-gu, Ulsan, South Korea

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling, Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • October 08, 2016

  • Valid to:

  • October 07, 2018

  • Registered since:

  • October 08, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Tianhe Oil Group Huifeng Petroleum Equipment Co. Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • No. 101, Committee 1,, Xinhua Bei, Hailing City,, Mudanjiang, Heilongjiang, People's Republic of China

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Kellies - Non Welded (NS.03.36.12.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Stabilisers - Integral Blade (NS.03.38.82.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

  • Stabilisers - Replacement Blade (NS.03.38.82.1110)
    - Heat Treatment, Inspection, Machining, Testing, Threading

SUSPENDED

  • Valid from:

  • June 13, 2012

  • Valid to:

  • June 12, 2013

  • Registered since:

  • November 05, 2010

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Vallourec Drilling Products France

FACILITY APPROVAL

Manufacturing

  • Facility:

  • Aulnoye-Aymeries Facility, 62 rue de Leval, 59620 Aulnoye, France

  • Equipment:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )
    - Assembly, Heat Treatment, Inspection, Testing, Upsetting

  • Drill Pipe Tool Joints (NS.03.30.00.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • June 04, 2016

  • Valid to:

  • June 03, 2018

  • Registered since:

  • June 04, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • ZA Du Tremblat, Route De Villechaud , 58200 Cosne Sur Loire, France

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • January 12, 2016

  • Valid to:

  • January 11, 2017

  • Registered since:

  • January 12, 2016

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 7 Rue des Frères Lumière,, 58200 Cosne sur Loire, France

  • Equipment:

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Crossover Pup Joints (NS.03.30.80.1130)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

  • Kelly Valve Sub (NS.03.35.01.1110)
    - Cold Rolling, Inspection, Machining, Testing, Threading

EXPIRED

  • Valid from:

  • January 12, 2016

  • Valid to:

  • January 11, 2017

  • Registered since:

  • January 12, 2016

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

WellConnection Norway AS - Mongstad

FACILITY APPROVAL

Service

  • Facility:

  • Storemyra 279, 5954, Mongstad, Norway

  • Service:

  • Cold Rolling

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)

  • Drill Pipe Tool Joints - Heavy Weight (NS.03.30.80.1110)

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)

  • Top Drive Saver Subs (NS.03.60.00.1120)

  • Drill Pipe with Welded Tool Joints (NS.03.30.00.1110 )

  • Drill Pipe & Crossover Pup Joints, Low Alloy, Non-Welded (NS.03.30.80.1130)

  • Valid from:

  • September 16, 2022

  • Valid to:

  • September 15, 2024

  • Registered since:

  • September 16, 2019

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • ISO 9001:2015

  • Exclusions:

  • ISO 9001:2015: Section 8.3 Design and Development of Product and Services.

Wellbore Integrity Solutions, LLC.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 1310 Rankin Road, Houston, Texas 77073, United States

  • Equipment:

  • Drill Collars - Low Alloy Steel (NS.03.38.10.1110)
    - Cold Rolling of Threads, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Substitutes - Drill Stem, Low Alloy, Non-Sour (NS.03.60.00.1110)
    - Cold Rolling of Threads, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)
    - Cold Rolling of Threads, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

EXPIRED

  • Valid from:

  • February 13, 2020

  • Valid to:

  • February 12, 2022

  • Registered since:

  • February 13, 2020

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.7.1.2 Servicing.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 1310 Rankin Road, Houston, Texas 77073, United States

  • Equipment:

  • Drill Pipe Tool Joints - Heavy Weight (NS.03.30.80.1110)
    - Cold Rolling of Threads, Heat Treatment, Inspection, Machining, Surface Treatment, Testing, Threading

  • Drill Pipe Body - Heavyweight (NS.03.30.80.1110)
    - Inspection, Machining

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)
    - Assembly, Inspection, Testing

EXPIRED

  • Valid from:

  • February 13, 2020

  • Valid to:

  • February 13, 2022

  • Registered since:

  • February 13, 2020

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.7.1.2 Servicing

“Drilling Technology” Ltd.

FACILITY APPROVAL

Manufacturing

  • Facility:

  • 47 Demyana Bednogo St. Nevyansk, Sverdlovsk Oblast, 624191, Russian Federation

  • Equipment:

  • Drill Pipe Body (NS.03.30.00.1110)
    - Heat Treatment, Inspection, Testing, Upsetting

  • Drill Pipe with Welded Tool Joints (NS.03.30.00.1110 )
    - Assembly

  • Valid from:

  • July 08, 2022

  • Valid to:

  • July 07, 2024

  • Registered since:

  • July 08, 2019

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • The application of Internal Plastic Coating was not assessed at time of audit and is therefore excluded from this NS-1™ approval.

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Black Diamond

DESIGN APPROVAL

Rotary connections

  • Name:

  • Rotary Connections: EVRDRL™ 3.90, EVRDRL™ 4.30, EVRDRL™ 5.00, EVRDRL™ 5.40, EVRDRL™ 5.70, EVRDRL™ 4.20 (NS.03.30.00.1110)

  • Valid from:

  • October 01, 2021

  • Valid to:

  • September 30, 2023

  • Registered since:

  • October 01, 2018

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

Command Tubular Products

DESIGN APPROVAL

Rotary connections

  • Name:

  • CTX™54 Rotary Connection (NS.03.30.00.1110)

  • Valid from:

  • December 14, 2022

  • Valid to:

  • December 13, 2023

  • Registered since:

  • December 14, 2022

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

DESIGN APPROVAL

Rotary connections

  • Name:

  • CTX™50 Rotary Connection (NS.03.30.00.1110)

  • Valid from:

  • December 14, 2022

  • Valid to:

  • December 13, 2023

  • Registered since:

  • December 14, 2022

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

DESIGN APPROVAL

Rotary connections

  • Name:

  • CTX™57 Rotary Connection (NS.03.30.00.1110)

  • Valid from:

  • December 14, 2022

  • Valid to:

  • December 13, 2023

  • Registered since:

  • December 14, 2023

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

DP-Master Manufacturing (S) Pte Ltd.

DESIGN APPROVAL

Rotary connections

  • Name:

  • DPM-ST® 57 Rotary Connection, DPM-ST® 54 Rotary Connection (NS.03.30.00.1110)

  • Valid from:

  • June 25, 2022

  • Valid to:

  • June 24, 2024

  • Registered since:

  • June 25, 2019

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

DESIGN APPROVAL

Rotary connections

  • Name:

  • DPM-High Torque 55 Rotary Connection, DPM-High Torque 40 Rotary Connection (NS.03.30.00.1110)

  • Valid from:

  • October 18, 2022

  • Valid to:

  • October 17, 2024

  • Registered since:

  • October 18, 2021

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

DESIGN APPROVAL

Rotary connections

  • Name:

  • Rotary Connection Design and Performance Review: DPM-DS55 (NS.03.30.00.1110)

EXPIRED

  • Valid from:

  • June 26, 2019

  • Valid to:

  • June 25, 2021

  • Registered since:

  • June 26, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

DESIGN APPROVAL

Rotary connections

  • Name:

  • DPM-ST52ZAD Double Shouldered Rotary Drilling Connection (NS.03.30.00.1110)

EXPIRED

  • Valid from:

  • July 08, 2020

  • Valid to:

  • July 07, 2022

  • Registered since:

  • July 08, 2019

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

DESIGN APPROVAL

Rotary connections

  • Name:

  • *DPM-ST® 39 Rotary Connection, manufactured from 120 kpsi material, DPM-ST® 38 Rotary Connection, manufactured from 120 kpsi material (NS.03.30.00.1110)

Re-approval Assessment in Progress

  • Valid from:

  • June 26, 2021

  • Valid to:

  • June 25, 2023

  • Registered since:

  • June 26, 2018

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

DESIGN APPROVAL

Rotary connections

  • Name:

  • DPM-DS55 Rotary Connection (NS.03.30.00.1110)

Re-approval Assessment in Progress

  • Valid from:

  • April 28, 2021

  • Valid to:

  • April 27, 2023

  • Registered since:

  • April 28, 2016

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

DESIGN APPROVAL

Rotary connections

  • Name:

  • DPM-DS50 Rotary Connection (NS.03.30.00.1110)

Re-approval Assessment in Progress

  • Valid from:

  • April 28, 2021

  • Valid to:

  • April 27, 2023

  • Registered since:

  • April 28, 2016

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

DESIGN APPROVAL

Rotary connections

  • Name:

  • Rotary Connection (NS.03.30.00.1110)

Application Underway

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

DP-Master Manufacturing Co. Ltd.

DESIGN APPROVAL

Equipment

  • Name:

  • Drill Pipe - Sour Service (Critical Sour Drilling IRP Vol. 1 Section 1.8)

EXPIRED

  • Valid from:

  • December 13, 2017

  • Valid to:

  • December 12, 2019

  • Registered since:

  • September 17, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

DSI FZE

DESIGN APPROVAL

Equipment

  • Name:

  • PBL Bypass Systems (3-1/8, (NS.03.38.82.1110 (Rev 04), NS.06.42.11.1110 (Rev 04))

  • Valid from:

  • August 21, 2022

  • Valid to:

  • August 20, 2024

  • Registered since:

  • August 21, 2017

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Don Mashburn Inc.

DESIGN APPROVAL

Equipment

  • Name:

  • Kelly Valve Sub (NS.03.35.01.1110)

EXPIRED

  • Valid from:

  • May 01, 2019

  • Valid to:

  • August 04, 2020

  • Registered since:

  • May 01, 2010

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

DESIGN APPROVAL

Equipment

  • Name:

  • Down Hole Filter Subs (NS.03.60.00.1110)

EXPIRED

  • Valid from:

  • May 01, 2019

  • Valid to:

  • August 04, 2020

  • Registered since:

  • November 28, 2010

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Frank's International LLC

DESIGN APPROVAL

Equipment

  • Name:

  • Harmonic Isolation Tool (NS.03.38.82.1110,NS.03.60.00.1110)

EXPIRED

  • Valid from:

  • June 12, 2017

  • Valid to:

  • June 11, 2018

  • Registered since:

  • June 12, 2017

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

DESIGN APPROVAL

Equipment

  • Name:

  • Q-Sub™ (NS.03.60.00.1120 (Rev 00) for the Main body (Part 2013521032) NS.10.31.01.1110 (Rev 02) for the packer cups NS.10.35.24.1110 (Rev 02) for the Flow tube (Part 2013521033), Telescopic Tube (Part 2013521)

EXPIRED

  • Valid from:

  • April 23, 2018

  • Valid to:

  • April 22, 2019

  • Registered since:

  • April 23, 2018

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

Golden Ring Industrial Limited-Liability Company Liaohe Oilfield Panjin

DESIGN APPROVAL

Equipment

  • Name:

  • Pre-stressed Insulated Tubing (PJQR/QR-5.4-01.A/0 version 2018.3)

Re-approval Assessment in Progress

  • Valid from:

  • April 14, 2019

  • Valid to:

  • April 13, 2020

  • Registered since:

  • April 14, 2019

NS-1™ Level 2 Certificate No: 218/19-2

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

Jiangsu Shuguang Huayang Drilling Tool Co., Ltd.

DESIGN APPROVAL

Rotary connections

  • Name:

  • JSHET39 Rotary Connection (NS.03.30.00.1110)

  • Valid from:

  • November 04, 2022

  • Valid to:

  • November 03, 2024

  • Registered since:

  • November 04, 2019

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

DESIGN APPROVAL

Rotary connections

  • Name:

  • JSHET54 Rotary Connection (NS.03.30.00.1110)

  • Valid from:

  • November 04, 2022

  • Valid to:

  • November 03, 2024

  • Registered since:

  • November 04, 2019

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

DESIGN APPROVAL

Rotary connections

  • Name:

  • JSHET57 Rotary Connection (NS.03.30.00.1110)

  • Valid from:

  • November 04, 2022

  • Valid to:

  • November 03, 2024

  • Registered since:

  • November 04, 2019

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

DESIGN APPROVAL

Rotary connections

  • Name:

  • JSHET50 Rotary Connection, HYHT55 Rotary Connection, HYHT40 Rotary Connection (NS.03.30.00.1110)

  • Valid from:

  • November 04, 2022

  • Valid to:

  • November 03, 2024

  • Registered since:

  • August 12, 2020

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

NOV Downhole Eurasia Ltd.

DESIGN APPROVAL

Equipment

  • Name:

  • Motor Catch Top Sub (NS.03.60.00.1110)

SUSPENDED

  • Valid from:

  • December 15, 2015

  • Valid to:

  • December 14, 2017

  • Registered since:

  • December 15, 2010

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Shanghai Hilong Drill Pipe Co., Ltd.

DESIGN APPROVAL

Rotary connections

  • Name:

  • HLIST38, HLIST50, HLIST57, HLMT5-1/2FH Rotary Connections (NS.03.30.00.1110)

EXPIRED

  • Valid from:

  • July 21, 2020

  • Valid to:

  • July 20, 2021

  • Registered since:

  • July 21, 2020

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

Shanxi Fenglei Drilling Tools Co., Ltd. (Shanxi North Fenglei Industrial Group Co., Ltd.)

DESIGN APPROVAL

Equipment

  • Name:

  • 6-⅝″ OD Landing String Thick Walled Drill Pipe c/w 6-⅝″ Full Hole Connections (NS.03.30.00.1110 )

  • Valid from:

  • March 31, 2023

  • Valid to:

  • March 30, 2025

  • Registered since:

  • March 31, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Smart Drilling GmbH

DESIGN APPROVAL

Equipment

  • Name:

  • Rotary Steerable Drilling System (NS.03.60.00.1110, NS.03.38.85.1110, NS.03.65.00.3110, NS.03.38.82.1110)

EXPIRED

  • Valid from:

  • September 01, 2016

  • Valid to:

  • August 31, 2018

  • Registered since:

  • September 01, 2010

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

DESIGN APPROVAL

Equipment

  • Name:

  • Rotary Steerable Drilling System (NS.03.60.00.1110, NS.03.38.85.1110, NS.03.65.00.3110, NS.03.38.82.1110)

EXPIRED

  • Valid from:

  • September 01, 2016

  • Valid to:

  • August 31, 2018

  • Registered since:

  • September 01, 2010

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Bohai NKK Drill Pipe Co., Ltd.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • 102 Donghuan Road, Qing County, Cangzhou City, Hebei Province 062658, People's Republic of China

  • Product(s):

  • Duraband® NC

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • April 07, 2023

  • Valid to:

  • April 06, 2024

  • Registered since:

  • April 07, 2023

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • 102 Donghuan Road, Qing County, Cangzhou City, Hebei Province 062658, People's Republic of China

  • Product(s):

  • Arnco 100XT™

  • Arnco 350XT™

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

EXPIRED

  • Valid from:

  • November 24, 2017

  • Valid to:

  • November 23, 2019

  • Registered since:

  • November 24, 2010

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

CJWinter

PROCESS APPROVAL

Equipment process

  • Process:

  • Cold Root Rolling of Rotary Shouldered Connections

  • Equipment:

  • Rotary Shouldered Connections (NS.03.30.00.1110)

EXPIRED

  • Valid from:

  • September 10, 2018

  • Valid to:

  • September 20, 2020

  • Registered since:

  • September 10, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Castolin Eutectic Ireland Limited

PROCESS APPROVAL

Hardbanding re-application procedure

  • Product re-applied:

  • Castolin OTW 12Ti

  • Product(s) re-applied over:

  • Castolin OTW 12Ti

  • TCS™ Titanium

  • Equipment:

  • Drill Pipe with Welded Tool Joints (NS.03.30.00.1110 )

  • Valid from:

  • August 16, 2021

  • Valid to:

  • August 15, 2023

  • Registered since:

  • August 16, 2011

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Exclusions:

  • Hardbanding on the Centre Wear Pad of Heavy Weight Drill Pipe.

PROCESS APPROVAL

Hardbanding re-application procedure

  • Product re-applied:

  • Castolin OTW 13CF

  • Product(s) re-applied over:

  • Castolin OTW 13CF

  • TCS™ Titanium

  • Arnco 350XT™

  • Equipment:

  • Drill Pipe with Welded Tool Joints (NS.03.30.00.1110 )

  • Valid from:

  • September 22, 2021

  • Valid to:

  • September 21, 2023

  • Registered since:

  • September 22, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Exclusions:

  • Hardbanding on the Centre Wear Pad of Heavy Weight Drill Pipe.

DP-Master Manufacturing Co. Ltd.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Shen'gang Industry Zone, Jiangyin City, , Jiangsu Province, 214443, People's Republic of China

  • Product(s):

  • Duraband® NC

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • December 13, 2021

  • Valid to:

  • December 12, 2023

  • Registered since:

  • December 13, 2017

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Shen'gang Industry Zone, Jiangyin City, , Jiangsu Province, 214443, People's Republic of China

  • Product(s):

  • Arnco 150XT™

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • December 13, 2021

  • Valid to:

  • December 12, 2023

  • Registered since:

  • March 11, 2013

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Shen'gang Industry Zone, Jiangyin City, , Jiangsu Province, 214443, People's Republic of China

  • Product(s):

  • Arnco 350XT™

  • TCS™ Titanium

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

EXPIRED

  • Valid from:

  • December 13, 2018

  • Valid to:

  • December 12, 2020

  • Registered since:

  • December 13, 2017

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Shen'gang Industry Zone, Jiangyin City, , Jiangsu Province, 214443, People's Republic of China

  • Product(s):

  • DPM 350

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

EXPIRED

  • Valid from:

  • February 03, 2022

  • Valid to:

  • February 02, 2023

  • Registered since:

  • February 03, 2022

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

DURUM VERSCHLEISS-SCHUTZ GMBH

PROCESS APPROVAL

Hardbanding re-application procedure

  • Product re-applied:

  • DURMAT FD 665

  • Product(s) re-applied over:

  • DURMAT FD 665

  • Equipment:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)

  • Valid from:

  • February 28, 2022

  • Valid to:

  • February 27, 2024

  • Registered since:

  • February 28, 2013

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Hebei Longway Petroleum Equipment Co., Ltd.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Beikou Village, Yingli Town , Jinzhou, Shijiazhuang City, Hebei, People's Republic of China

  • Product(s):

  • TCS™ Titanium

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • September 01, 2022

  • Valid to:

  • August 31, 2024

  • Registered since:

  • January 29, 2019

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Henan Zhongyuan Special Steel Equipment Manufacturing Co., Ltd

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Jiyuan City Henan Province, 459008, People's Republic of China

  • Product(s):

  • Duraband® NC

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • June 20, 2022

  • Valid to:

  • June 19, 2024

  • Registered since:

  • February 13, 2020

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Hilong Petroleum Pipe Company LLC

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Industrial City, Abu Dhabi, United Arab Emirates

  • Product(s):

  • BoTn 1000

  • BoTn 3000

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

EXPIRED

  • Valid from:

  • January 12, 2017

  • Valid to:

  • January 11, 2018

  • Registered since:

  • January 12, 2011

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

PROCESS APPROVAL

Internal Plastic Coating as part of manufacture

  • Facility:

  • Industrial City, Abu Dhabi, United Arab Emirates

  • Product(s):

  • TC 2000

EXPIRED

  • Valid from:

  • January 12, 2017

  • Valid to:

  • January 11, 2018

  • Registered since:

  • January 12, 2011

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Hunting Energy Services Limited

PROCESS APPROVAL

Wear Band application

  • Facility:

  • Unit 1, Hareness Circle, Altens Industrial Estate, AB12 3LY, United Kingdom

  • Product(s):

  • Wear Band

SUSPENDED

  • Valid from:

  • November 01, 2015

  • Valid to:

  • October 31, 2017

  • Registered since:

  • November 01, 2010

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

Jiangsu Hexin Petroleum Machinery CO., LTD

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • No.9, Weiwu Road, Dongtai Industrial Park, Dongtai City, Jiangsu Province, 224200 , People's Republic of China

  • Product(s):

  • Arnco 350XT™

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • October 10, 2022

  • Valid to:

  • October 09, 2024

  • Registered since:

  • October 10, 2021

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • No.9, Weiwu Road, Dongtai Industrial Park, Dongtai City, Jiangsu Province, 224200 , People's Republic of China

  • Product(s):

  • Arnco 150XT™

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

EXPIRED

  • Valid from:

  • January 31, 2018

  • Valid to:

  • January 30, 2019

  • Registered since:

  • January 31, 2018

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Jiangsu Shuguang Huayang Drilling Tool Co., Ltd.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Shuguang Avenue # 18, Baimi Town, Jiangyan District, , Taizhou City, Jiangsu Province, 225532, People's Republic of China

  • Product(s):

  • Castolin OTW 13CF

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)

  • Valid from:

  • March 31, 2023

  • Valid to:

  • March 30, 2025

  • Registered since:

  • June 17, 2019

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Shuguang Avenue # 18, Baimi Town, Jiangyan District, , Taizhou City, Jiangsu Province, 225532, People's Republic of China

  • Product(s):

  • Arnco 100XT™

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)

  • Valid from:

  • March 31, 2023

  • Valid to:

  • March 30, 2025

  • Registered since:

  • June 11, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Jiangsu TSC Coating Co., Ltd.

PROCESS APPROVAL

Internal Plastic Coating as part of manufacture

  • Facility:

  • Shuguang Industrial Park, Shuguang Road, Baimi Town, Jiangyan City, Jiangsu Province, People's Republic of China

  • Product(s):

  • TC 2000

  • Valid from:

  • June 26, 2022

  • Valid to:

  • June 25, 2024

  • Registered since:

  • June 26, 2019

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Exclusions:

  • ISO 9001:2015: Section 8.3 Design and development of product and services

PROCESS APPROVAL

Internal Plastic Coating as part of manufacture

  • Facility:

  • Shuguang Industrial Park, Shuguang Road, Baimi Town, Jiangyan City, Jiangsu Province, People's Republic of China

  • Product(s):

  • TC 2000P

  • Valid from:

  • June 26, 2022

  • Valid to:

  • June 25, 2024

  • Registered since:

  • June 26, 2019

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Exclusions:

  • ISO 9001:2015: Section 8.3 Design and development of product and services

Jiangyin Long-Bright Drill Pipe Manufacture Co. Ltd

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • No.820, Binjiang West Road, Ligang Town, Jiangyin City, Jiangsu Province, People's Republic of China

  • Product(s):

  • Arnco 100XT™

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

EXPIRED

  • Valid from:

  • January 26, 2015

  • Valid to:

  • January 25, 2017

  • Registered since:

  • January 26, 2014

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • ISO/TS 29001: Section 7.3 Design and Development.

Lincoln Electric

PROCESS APPROVAL

Hardbanding re-application procedure

  • Product re-applied:

  • Hardbanding Product A

  • Product(s) re-applied over:

  • Hardbanding Product A

  • Equipment:

  • Drill Pipe Tool Joints (NS.03.30.00.1110)

Application Underway

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

NOV (Jiangsu) Energy Equipment Limited (former Grant Prideco (Jiangsu) Drilling Products Company Ltd.)

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • 18 Zhanghang Road, Jiangyan City, Jiangsu Province, People's Republic of China

  • Product(s):

  • Duraband® NC

  • Castolin OTW 13CF

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • January 08, 2023

  • Valid to:

  • January 07, 2025

  • Registered since:

  • April 14, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • 18 Zhanghang Road, Jiangyan City, Jiangsu Province, People's Republic of China

  • Product(s):

  • Arnco 100XT™

  • Arnco 150XT™

  • Arnco 350XT™

  • TCS™ Titanium

  • TCS 8000

  • Smooth X

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • January 08, 2023

  • Valid to:

  • January 07, 2025

  • Registered since:

  • January 08, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Petromaterials (Cangzhou) Co., Ltd.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Gongmaoxiaoqu, Qingzhouzhen, Qing County, Hebei, People's Republic of China

  • Product(s):

  • Tuffband NC

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

  • Valid from:

  • May 14, 2022

  • Valid to:

  • May 13, 2024

  • Registered since:

  • May 14, 2020

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Gongmaoxiaoqu, Qingzhouzhen, Qing County, Hebei, People's Republic of China

  • Product(s):

  • Arnco 350XT™

  • Arnco 100XT™

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

EXPIRED

  • Valid from:

  • May 14, 2020

  • Valid to:

  • May 13, 2022

  • Registered since:

  • May 14, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment Standards.

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Pipe & Drilling Tools Manufacture Co. Ltd.

PROCESS APPROVAL

Hardbanding as part of manufacture

  • Facility:

  • Petro & High-Tech Industrial Park Economic Development Zone, Panjin City, Liaoning 124013, People's Republic of China

  • Product(s):

  • BoTn 3000

  • Equipment:

  • Drill String Members - services only (NS-1 Drill Pipe Specifications)

EXPIRED

  • Valid from:

  • August 22, 2019

  • Valid to:

  • August 21, 2021

  • Registered since:

  • August 22, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.

Postle Industries, Inc.

PROCESS APPROVAL

Hardbanding re-application procedure

  • Product re-applied:

  • Duraband® NC

  • Product(s) re-applied over:

  • Smooth X

  • Duraband® NC

  • Armacor

  • TCS™ Titanium

  • TCS 8000

  • Tuffband NC

  • Arnco 150XT™

  • Arnco 100XT™

  • Castolin OTW 12Ti

  • Equipment:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)

  • Valid from:

  • March 17, 2023

  • Valid to:

  • March 16, 2025

  • Registered since:

  • December 11, 2009

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • Hardbanding on the Centre Wear Pad of Heavy Weight Drill Pipe

PROCESS APPROVAL

Hardbanding re-application procedure

  • Product re-applied:

  • Tuffband NC

  • Product(s) re-applied over:

  • Smooth X

  • Tuffband NC

  • Equipment:

  • Drill Pipe - Welded, Low Alloy, Non-Sour (NS.03.30.00.1110 )

  • Drill Pipe - Heavy Weight, Welded, Low Alloy, Non-Sour (NS.03.30.80.1110)

  • Drill Pipe - Heavy Weight, Non Welded, Low Alloy, Non-Sour (NS.03.30.80.1120)

  • Valid from:

  • March 16, 2023

  • Valid to:

  • March 15, 2025

  • Registered since:

  • March 16, 2012

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Exclusions:

  • Hardbanding on the Centre Wear Pad of Heavy Weight Drill Pipe.

Shandong Weima Equipment Science & Technology Corporation Limited

PROCESS APPROVAL

Internal Plastic Coating as part of manufacture

  • Facility:

  • No. 5 Fuqian Street, Economic Development Zone , Dongying City, Shandong Province, People's Republic of China

  • Product(s):

  • WT300 and WT300P

  • Valid from:

  • February 28, 2023

  • Valid to:

  • February 27, 2025

  • Registered since:

  • June 17, 2015

  • Standards:

  • Fearnley Procter NS-1™ Edition 3 Quality and Inspection Requirements for New and Refurbished Drilling and Well Completion Equipment

  • Spec Q1 (API) 9th Edition

  • Exclusions:

  • Spec Q1 (API): Section 5.4 Design and Development and Section 5.7.1.2 Servicing.